FVH1CIP - Mainline West

The Elevation team was selected to deliver project management services for the Mainline West project which is part of the Program’s Phase 3A. They effectively managed scope, schedule, cost, and risk to progress the design/bid/build project through detailed design and into construction.
Client
Ministry of Transportation and Infrastructure
Date
October 1, 2024
Services
Project Management

Through the Fraser Valley Highway 1 Corridor Improvement Program, the Province of B.C. is improving Highway 1 in the Fraser Valley to better serve the growing region and the more than 80,000 motorists who use the highway between Langley and Abbotsford, and through the Sumas Prairie into Chilliwack every day.

The Mainline West project includes the following improvements:

  • Widening of Highway 1 between approximately Lefeuvre Road. To Ross Road to accommodate eastbound and westbound (HOV)/(EV) lanes in the median and (BOS) lanes.
  • Improvements to the inside shoulder to provide sufficient clear zone and/or barrier placement to achieve current design criteria.
  • Improvements to truck climbing lanes including:
    • Westbound from Mt Lehman to Bradner Road (extension to existing climbing lane)
    • Eastbound from Bradner Road to Mt Lehman (proposed climbing lane)
  • Replacement of two structures at Bradner Road
  • New Multi-Use Path (MUP) paralleling Highway 1 approximately from Lefeuvre Road to Ross Road.
  • Environmental offsetting and enhancements.